1
Job Information
2
Work Phases โ€” by Date
3
Materials Used
4
Site Photos
๐Ÿ“ท

Tap to add photos or drag & drop here

Label each with the unit # (e.g. Unit #1082 โ€“ floor patch done)

5
Notes for Office / Next Shift
6
Construction Manager Sign-Off

The CM or authorized supervisor confirms the work described above was carried out. Hand the device to them to sign below.

โœ๏ธ Sign here
โ†“
Generate & Send to Office

Step 1: Scroll up to Section 6 โ€” have the CM sign on the pad with their finger or stylus.
Step 2: Tap Generate Field PDF โ€” the digital signature is automatically embedded in the PDF.
Step 3: Tap Export to Office โ†’ copy the code โ†’ send via WhatsApp/email to office.

โ†‘
Load Data from Super